General Approved Drawing
- 11kV Metal Enclosed Switchboard – STP
- 750 KVA DG Sets for STP
- 1600 KVA Transformer with OLTC for STP
- DG Sizing Calculation – STP
- Earthing Design Calculation for STP
- Electrical Load List for STP
- Key Sigle Line Diagram for STP
- Ladder & Perforated Cable trays for HT, Control and Inst. for STP
- Lightening Protection Calculation for STP
- Transformer Sizing calculation for STP
- Field QAP for Civil works and Piping works
- BFP Feed pump Documents
- Chlorinator & Accessories
- Coarse Screen
- Filtrate Pump Documents
- Fine screen and Belt conveyor
- Grit Removal System
- RAS Pump Documents
- SAS Pump Documents
- Volute Press Documents
Admin Building
Civil
- Civil GA & Section of Admin Building
- Reinf. detail of colum, Wal & Staircase Admini building 1-4
- Reinf. detail of colum, Wal & Staircase Admini building 2-4
- Reinf. detail of colum, Wal & Staircase Admini building 3-4
- Reinf. detail of colum, Wal & Staircase Admini building 4-4
Electrical & Mechanical
SBR Drawings
Civil
- SBR Distribution Tank and SBR Basins 1/2
- SBR Distribution Tank and SBR Basins 2/2
- Wall Reinforcement Detail of SBR Distribution Tank and SBR Basins 1/4
- Wall Reinforcement Detail of SBR Distribution Tank and SBR Basins 2/4
- Wall Reinforcement Detail of SBR Distribution Tank and SBR Basins 3/4
Electrical & Mechanical
Staff Quarters Type – I
Civil
- Architectural drawing of staff quarters
- Beam Elevation DET of Staff quarter (1/2)
- Beam Elevation DET of Staff quarter (2/2)
- GA-Drawing-for-Staff-Quarter
Electrical & Mechanical
Staff Quarters Type – II
Civil
- Architectural drawing of staff quarters 2 of 5
- Architectural drawing of staff quarters 3 of 5
- Beam elevation Det of 2nd, 3rd, terrace and mumty floor staff quater
- Beam elevation Det of Plinth & first floor staff quater
- Civil GA Drawing for Staff Quarter 1 of 1
- Reif.Det of Col. Schedule & Slab Reinf. & Stair case det of staff Quarter
- Reinf. Det of Foundation staff quarters (1/4)
Electrical & Mechanical
Staff Quarters Type – III
Civil
- Archi Drawing Staff Quarters
- Beam Elevation for Staff Quarters
- GA Drawing Staff Quarters
- Slab Reinf. Staff Quarters
Electrical & Mechanical
Staff Quarters Type – IV
Civil
- Archi Drawing Staff Quarters
- Beam Elevation for Staff Quarters
- GA Drawing Staff Quarters
- Slab Reinf. Staff Quarters
Electrical & Mechanical
Sludge Treatment Building
Civil
Electrical & Mechanical
C C T Drawings
Civil
- GA Drawing & Section. (1/2)
- GA Drawing & Section. (2/2)
- RCC Detail. (1/3)
- RCC Detail. (2/3)
- RCC Detail. (3/3)
Electrical & Mechanical
Parshal Flame
Civil
Electrical & Mechanical
Main Pumping Station
Civil
Electrical & Mechanical
- 11kV Metal Enclosed Switchboard – MPS
- 625 KVA DG Sets for MPS
- 1250 KVA Transformer with OLTC for MPS
- DG Sizing Calculation – MPS
- Earthing and Lightening Protection Calculation – MPS
- Electrical Load List for MPS
- Key SLD for MPS
- Ladder & Perforated Cable trays for HT, Control and Inst. for MPS
- Transformer Sizing Calculation for MPS
Air Blower And Electrical Room
Civil
- Air Blower & Electrical Room GA Drawing Sheet 1/2
- Air Blower & Electrical Room GA Drawing Sheet 2/2
- Air-Blower-Electrical-Room-GA-Drawing-1-2
- Air Blower & Electrical Room R.C.C Details 1-5
- Air Blower & Electrical Room R.C.C Details 2-5
- Air Blower & Electrical Room R.C.C Details 3-5
- Air Blower & Electrical Room R.C.C Details 4-5
- Air Blower & Electrical Room R.C.C Details 5-5
Electrical & Mechanical
Inlet and Parshall Flume
Civil
Electrical & Mechanical